Building
Needs Assessment Work Group Minutes
October
20, 2022 1:00
In
Person at 1650 Pankratz Street, Madison, WI
Present:
Jean Anderson SCLS
Consulting Services Coordinator
Corey Baumann SCLS
Delivery Services Coordinator
Kerrie Goeden SCLS HR & Finance Coordinator
Gary Poulson SCLS
Board Trustee and Chair
Jesse Stewart SCLS
Fleet Manager
Vicki Teal SCLS
Technology Services Coordinator
Martha Van Pelt SCLS Director
Kristi Williams SCLS Board Trustee
Guests:
Devin Flanigan Keller Project Manager
Deb
Haeffner SCLS
Consultant
David Haug Lighthouse Realty
Rob Lindstrom Keller
Architect
Absent:
Nan Brien SCLS Board Trustee
Call to Order by K. Goeden at 1:10
Approval of previous meeting minutes: October 6, 2022
a. Motion by J.
Stewart to approve the minutes
b.
Second by J. Anderson
c. Approved
Reports:
o Critical
Controls Calendar
§ D.
Haug reported that the items left to complete are in
the hands of the attorneys.
o Closing
Timeline
§ D.
Haug is working to get all the paperwork for the
closing done before the actual date to keep the timeline tight.
§ G.
Poulson will not be traveling around Thanksgiving so that will help to get
signatures.
§ Goal
is to close as soon as November 19, 2022 but no later than December 2, 2022.
o Ground
Lease Assignment Update
§ Dane
County has submitted the resolution to approve SCLS assuming the ground lease.
The approval process must go through 3 committees of the Dane County
Board. Goal is to have final approval by
November 18, 2022.
o Data
Center Update
§ Mark
Fernstrum of Access Inc
will be at Pankratz today as part of the walkthrough
and meet with staff and D. Flanigan about the data
center.
o City
of Madison Update on Plans
§ D.
Haug has looped the City of Madison in via M. Mikolajewski
§ D.
Flanigan asked the city to put SCLS on their DAT
meeting for 10/27 to discuss the sanitary line and sidewalks which require a
developer’s agreement if changes are needed.
§ 11/19/2022
Need to notify the City of Madison Alder of application for conditional use
permit – 30 day notice
§ 12/19/2022
Submit conditional use permit
§ 2/1/2023
Submit plans to Madison Urban Design
§ 2/1/2023
Plans go out for bid
§ 2/13/2023
City of Madison Planning Commission submit plans
§ 2/28/2023
Common Council
§ 3/1/2023
Open bids
§ 3/23/2023
SCLS Board approve subcontractors
§ 5/1/2023
Start construction
Discussion:
§ Review floor plans
o
D.
Haug received Pankratz blue
prints from Sullivan, the original builder.
o
Educational
building (Lakeland University) HVAC is oversized compared to office building
needs. They expected to cool the
building filled with hundreds of students. HVAC affects transformer size. 800 amperes currently. Delivery and the data center will affect the
need. Keller has the information from
Access. May require a switch gear which is 45-55 weeks out to order. New transformer may be needed or use existing
one but either way it has to be moved.
This will end up being the location of the generator. Madison GE moves the transformer. 3-4 month notice to move. May require trenching into the building. D. Flanigan needs
to figure this all out.
o
Final
floor plan changes due to Keller by BNAW on October 31, 2022.
o
Fearing’s
will need to meet with Keller when Fearing’s draws new plans. SCLS will use, return and reuse the AV and
security equipment purchased earlier via Fearing’s for the Walton Commons site. Waiting for Fearing’s to do inventory of
purchased equipment
o
Break
Room - R. Lindstrom suggested that monitors be installed during construction to
save costs. Steel stud in walls. Would have to cut hole in wall and then put
in blocking to mount monitors.
o
Tech
Prep Room needs no work
§ 2nd electrical panel may go
into Tech Prep Room
o
SCLS
will supply staff cubicles
o
Big
Meeting Room needs nothing except new doors from lobby.
o
Save existing cupboards on new site to reuse. Gentle demo.
Also want to resell folding walls if in good shape.
o
Existing
offices need no prep. Owner will supply
desks.
o
Professional
Collection shelving and furniture will be owner supplied.
o
Indus
scanner in recording – digitization room.
Make sure it has needed electrical.
o
Okay
to put Delivery’s rubberized flooring as alternate bid
o
Sorting
floor’s drinking fountain with bottle filler.
Double fountain is nearly the same price as single.
o
Loading
Dock area – remove levelers, bollards, we own dock extenders. R. Lindstrom wants to reduce retention wall
for more sanitation line room. R.
Lindstrom will
talk with delivery. D. Flanigan has all the information. Water in garage for washing trucks inside.
o
Loading
Dock - put HVAC/heater unit on the dock
o
Only
casework is in the workroom.
Work Room/ Maker Storage:
Deb Haeffner
redid layout and shared with group including Keller
On left side of the room: Mail slots,
supply cabinet and maker utility shelving along the wall.
Keep partition and tables in the
middle. Partition is 9 ft long to accommodate delivery envelopes and computer on
one side. Laminator and counter on the
other side of partition wall.
On right side of the room: 4 ft of paper
shelving, 7 ft for copier, 3 ft
for folder, lower and upper cabinets.
Back wall: cutting table and cutter.
Keep 2 open doorways
SCLS to provide the mail slots, supply
cabinet, utility shelving for the maker kits, big cutting table, 3 ft table for the folder, 4 ft. paper shelving, and both
tables for the middle of the room.
Keller to build in the counters, lower
and upper cabinets.
Data Center: See Access plan.
Need to confirm that we can do
electrical work on our own. Mark from Access will confirm cost of labor for the
data center installation.
Clarify from Keller if their engineers
will be involved in electrical or construction at all. (Wall covering window
for example). If anything is deemed “construction” must be under $25,000.
Verify if SCLS can have total control
over this room and the installation of the equipment.
Staff Break Room:
Using as is. No work needed.
Possibly add meeting room #2 AV
equipment and 2 monitors down the road. Check with Fearing’s to see if we have
to keep this equipment. Is the lounge wall able to support the monitors?
Kitchen (Vending):
Add 2 refrigerators. Check electrical for 2 refrigerators and 2
microwaves.
Bathrooms:
Using as is. No work needed.
Janitor Closet:
Using as is.
Tech Prep Room:
Need to assess electrical and data.
No cabinets or counters needed.
Using as is.
Cubicle Room:
We like the new central opening
proposed for this room, but leave room for 6x7 ft. cubicles. (7 ft. into the
room.)
Otherwise, using the room as is. No other work needed besides relocating the
entry to the room.
New Office Corner:
Tech team will take inventory of the
existing electrical and will map out a standard electrical/data plan.
Cindy’s office will have a self-check
unit that will need power.
Large Meeting Room:
We are not installing any new
cabinetry or counters. May move the cabinets from the office hallway (by the
recording room) into the meeting room.
Monitors as shown on plan. Check the electrical.
Existing Offices:
Will use as is.
Professional Collection:
The work station has data and
electrical.
Recording/Digitization Room:
Might need data and electrical
installed (Indus scanner)
Need to assess counters, etc.
Huddle Room:
Identify location of monitors and
sound bar.
Electrical and data location.
New Offices:
Standard electrical and data plan.
Delivery Copier Area:
Do not need built in storage/counters/cabinets. They will
bring the tables, cabinets and cubbies that they already have.
Move copier up near the 2 west offices.
Need data and electrical there.
Locate the route boxes and mailboxes there.
Delivery Monitors:
Located on east wall adjacent to
garage.
Delivery Flooring:
Bid out the rubberized flooring as an
alternate bid.
Delivery Sorting Racks:
SCLS provided.
Loading Dock Area:
Remove the levelers. Remove the
bollards. Don’t need them.
SCLS owns our dock extenders, will see
if we can bring those to the new building.
Want as little pitch as possible for
the slope. Currently at 3 ft on the plan. Verify that the slope of the pitch is not
too steep for the carts in the trucks.
Need the deck of the truck to be level with the floor of the dock.
Garage:
Make sure we have water piped into the
garage and hoses to wash the vans in the middle of the garage.
Mechanics Shop/Equipment Shop:
Jesse will map out equipment and will
work with Keller on electrical/data needs in the mechanics shop and equipment
shop.
§ Timeline Update
o
Construction
documents
§ November 2022 – January 2023
o
Bid
schedule
§ 2/1/2023
Plans go out for bid
§ 3/1/2023
Open bids
§ 3/23/2023
SCLS Board approve subcontractors
§ 5/1/2023 Start
construction
§ Break ground April - May 2023
§ Administration portion done July-
August 2023
§ Delivery done December 2023
Adjournment: 2:30
Staff tour of Pankratz building
3:00
Remaining List of Options to Consider:
Option D: Purchase office building and continue to lease
Delivery
This would be the option if the Pankratz
bids come in over budget.
Topics tabled for Upcoming meetings:
·
Schedule Admin and
Delivery meetings to discuss shared HR and filing spaces
·
Building
Permit
Homework for Next Meeting:
1)
Outline plan of how SCLS will operate during
construction post Memorial Day.
2)
Notify City of Madison Alder by 11/19/2022 with 30 day
notice of application for a conditional use permit
3)
Identify anything we can do in the building between
closing and Memorial Day 2023.
4)
Does SCLS own the garbage container enclosure?
Next Meeting:
November
3, 2022 10:00 am – 12:00 pm
Review
plans incorporating feedback received from SCLS departments from 10/31/2022
Parking Lot:
·
Notify Michelle Drea at the
City of Madison Assessor’s office when we purchase a site. mdrea@cityofmadison.com
·
Apply for tax exemption